Fleet Headquarter — Civil, finishing, fire safety
38,000 m² civil works, floor tile, putty & paint, false ceiling, fire-safety pipeline.

Eight-plus years of civil construction and supply — much of it on one of Bangladesh's most demanding national projects.
For the Bangladesh Navy at Pekua, we delivered civil works across the Fleet Headquarter, ward rooms, generator rooms, roads, prefabricated steel structures and boundary walls — and one of the most demanding jobs in the country: excavating the world's third-largest harbour basin, sized for seven submarines.

Civil works, deep excavation, roads, steel structures and land development — for the Bangladesh Navy and leading international contractors.

38,000 m² civil works, floor tile, putty & paint, false ceiling, fire-safety pipeline.

12,000 m² finishing — floor tile, putty & paint.

600×400×18 m basin for seven submarines; ~150 pieces heavy equipment deployed.

3 km rigid pavement, 3000 m × 4 m × 0.3 m, incl. 2000 m³ water tank.

6 assemblies, ~1080 m² each; diesel & water reserve tanks.

Diesel tanks Ø18 m × 16 m shell height; 2 × 2000 m³ water tanks.

3 km boundary wall and sea-water flow protection wall.

200,000 m³ sand filling and land development.

Installation of 4-inch and 16-inch diameter tube-wells, 12 pieces.
Construction, equipment, manpower or materials — message us on WhatsApp with your requirement and site, and our team responds fast.